Preferred operation is under Microsoft Windows 2000 or XP. Once tests are started, the test system operates automatically, with or without supervision. The sequence of system operation is quite logical.
Write a Test Plan - Line oriented test plan, with a simple to understand and easy to use editor. Uses direct keyboard entry with assistance from wizards.
Start a Test - Individual channel or a group of channels can be started simultaneously, with the possibility to perform a time delayed start.
Monitor in Real Time - A single detailed screen displaying real time data and real time graphics is provided, essential for use in short term electrochemical experiments.
Record Data - Test data is recorded at user specified intervals into a local SQL database in the system PC. This database system makes it simple to identify tests, and to get all information relating to the test, whether the test is still active or was completed a long time ago.
Analyze Data - The integral data analyzing tool makes it possible to analyze data from both active and completed tests. Analysis can be performed numerically using powerful filters, or graphically, and can be used to generate professional reports.
Export Data - For some larger users, the capability to export test data to the company's internal network is provided.
|